you are in: photo > gallery

Glattalbahn construction

click to reduce size

14th May 2009. Construction of Glattalbahn. Phase three tracks taking shape at Auzelg. The terminus of phase one (with tram) is visible in the background (opened 2006). The grassed stub tracks were laid with phase one to permit phase three to be connected.

<to photo index start page | search in photo index

To link to this page directly, please use the following link:
http://photo.proaktiva.eu/?pict=tram/zurich/090518.05