Glattalbahn phase 2 on 5th February 2008 5th February 2008. Railway bridge over Hagenholzstr. The new tram tracks are visible in the foreground. To permit these to pass under the bridge, the roadway must be widened at the expense of the pavement. This is being replaced by a pedestrian tunnel to be excavated to the left behind the digger.
<to photo index start page | search in photo index
To link to this page directly, please use the following link: |